Local Services / Parking Lot Striping · Claim Review
“How much do you charge for a parking lot striping JOB? This is how much I charge (LINES ONLY)”
What we found: Striping Quotes That Add Up — Except the $800 Bid That Wasn’t 80 Cents a Foot
A per-foot pricing method with its arithmetic worked on screen. Nearly every sum is right; the one real discounted bid came in below the rate he says it held.
- 40¢–$1.25/ft Rate range
- $828.80 Worked quote
- ~74¢/ft Discounted bid
- None Income stated
The claim
That parking lot line striping should be priced per linear foot, at roughly 40 to 80 cents on larger lots and more on small ones, and that pricing too high loses bids.
- Market range he cites — 40¢ to $1.25 per linear foot
- Standard stall line — 18 feet
- Per line at 40¢ / 80¢ — $7.20 / $14.40
- 52-line estimate with paint — $828.80
- Dentist lot: 10 lines, aisle, symbol — ~$450 in about 1h45m
- 200 stalls solo — ~$1,440 in ~8 hours
- 60-line bid, cut from ~$950 — $800
- Rate that bid actually represents — ~74¢/ft, before symbols and aisles
- Revenue, job count, equipment cost — Never stated
What is this income idea?
Paint the lines on commercial parking lots, pricing each job by the linear foot of line and adjusting the rate to lot size and local competition.
- The creator, who runs a striping business in Oklahoma, opens by refusing the question most beginners ask in Facebook groups. Nobody can tell you what to charge, he says, without knowing the lot's condition, your travel, your supply cost and your overhead. What he offers instead is how he prices.
- The unit is the linear foot. A standard stall line is 18 feet. He knows operators charging anywhere from 40 cents to $1.25 a foot; at 40 cents that is $7.20 a line, at 80 cents $14.40, at $1.25 $22.50.
- Scale sets the rate. For a shopping centre with hundreds of lines he stays between 40 and 80 cents; a 500-line centre at 80 cents is $7,200 "just to stripe it", before paint, labour or prep. For a chiropractor or dentist with ten lines, the per-foot rate would not cover setting up the machine, so he charges far more: a dentist's lot with ten lines, an access aisle and a disabled-parking symbol went for about $450.
- He then prices a real 52-line lot on screen: $374.40 at 40 cents, $748.80 at 80 cents, plus about $80 for paint, for an estimate of $828.80.
- The lesson he repeats most is about losing work. When he started he "heard about people charging a dollar fifty" and priced at a dollar, and "kept missing out on large opportunities". A quote that looks high, he says, sends customers for a second opinion.
- He closes with a recent bid he trimmed from about $950 to a flat $800 for 60 lines, three disabled-parking symbols and three access aisles — "still I think 80 cents per linear foot" — which was accepted within the week.
Charge by the foot of painted line, charge small lots more per foot than big ones, and do not price yourself out of the bid.
- Count the lines — From above
- Multiply by 18 ft — Standard stall line
- Pick a rate — 40¢–80¢ large lots
- Add paint — ~$60–$80 for 52 lines
- Sanity-check the total — Avoid a second opinion
- Measure on site — Measuring wheel
A usable quoting method with the arithmetic shown. Income is outside its scope.
A pricing video that mostly shows its working
The lesson underneath the number
- Most videos in this genre announce a price and move on. This one does something more useful: it names the unit, gives the market range, explains why the rate should move with lot size, and then works through real quotes on a calculator with the figures read aloud. That makes it checkable, and when we check it, almost all of it is right — per-line prices, the 500-line shopping centre, the 52-line estimate and the paint add-on all multiply out exactly.
- He is also candid about the cost of getting pricing wrong. The main lesson he wants to pass on is that he lost work early by charging too much, "about five or six times" before he adjusted, and that a high number invites a second opinion. In a genre that usually pushes people to charge more, a creator saying he overpriced and paid for it is worth hearing.
- The one slip is in the example meant to prove the point. He trimmed a 60-line bid to $800 and believed it still held 80 cents a foot. It did not — 1,080 feet of line at 80 cents is $864 before the three symbols and three aisles — and his original $950 was almost exactly what his own method would have produced once paint was added. The bid was won, which supports his argument about reasonable prices; it also means the discount was deeper than he realised.
- What the video deliberately does not cover is income. It is titled around what he charges, and delivers that. There is no annual revenue, no count of jobs, no equipment cost and no wage figure for the helpers he mentions. A viewer comes away able to quote a lot, but not able to judge what a year of quoting would earn.
I missed out on so many big opportunities because I was charging too much.
The creator, on the mistake the video is meant to prevent
The pricing method, as he gives it
Lines only — he excludes arrows, wheel stops, symbols and aisles from the per-foot rate.
He works figures on an on-screen calculator; we checked each against the numbers he reads out.
- Price per linear foot — An 18-foot stall line multiplied by a per-foot rate. At 40 cents that is $7.20; at 80 cents, $14.40. Simple enough to quote from an aerial photo.
- Low rates only on large lots — "If you've got 200 to 250 stalls or 500 stalls or 600 stalls then charge 40 cents." Below that, set-up time dominates and the per-foot rate must rise.
- Charge small lots a floor, not a rate — Ten lines at $1.25 a foot is only about $225. He charged a dentist about $450 for ten lines, an aisle and a symbol because of the time to pay helpers, set up and buy paint.
- Quote paint separately — About two to two-and-a-half gallons for a lot of roughly 52 to 54 lines; he budgets $60 to $80 and rounds up to $80 "to be safe".
- Do not price yourself into a second opinion — He lost bids early by charging too much, and says it happened "about five or six times" before he adjusted. If a customer takes a long time to respond, "they're getting a second opinion".
- Measure with a wheel — A measuring wheel "is going to be your best friend" for accurate footage.
The business model
Per-job fees for painting parking lot lines, priced per linear foot, with symbols, aisles, arrows and wheel stops quoted separately.
Commercial property owners, from small practices with ten spaces to shopping centres with hundreds.
Fresh, accurate lines at a price low enough that the owner does not seek a second quote.
Inbound service requests and bids. Marketing channels are not discussed.
- Paint — ~$60–$80 per ~52-line lot. The only priced cost
- Helpers — Mentioned as a reason small jobs cost more. Wages never given
- Striping machine — Referenced. Never priced
- Prep — Sweeping, power washing — explicitly excluded from the rate
- Travel — Named as a pricing factor. Never priced
- Overhead — Named at the start. Never quantified
He is careful to say the per-foot rate "doesn't include your paint cost … the labor … the prep work". That is an honest framing; it just leaves the profit on any job unknowable.
What you would actually need
Money
Paint is the only cost he puts a figure on: about $60 to $80 for a lot of roughly 52 lines. He says clearly that the per-foot rate excludes paint, labour and prep.
Being explicit that the rate is not profit is to his credit. But the striping machine, stencils, a helper's wages, travel, insurance and any sweeping or power-washing are never priced, and those decide what an $800 job actually leaves.
Named or implied, never priced
- A line-striping machine
- Paint — ~$60–$80 per ~52-line lot (stated)
- Helpers who set up and run the machine
- Sweeping or power-washing prep
- Stencils for symbols and arrows
- Travel to each lot
- A measuring wheel
Time
52 lines in "three or four hours", later "two to three hours"; 200 stalls in about eight hours solo; a 10-line dentist lot in about an hour and 45 minutes.
These are useful benchmarks, with one inconsistency: the same 52-line lot is given two different durations a minute apart. Neither includes travel, prep, layout or quoting time.
Stated job times
- 10 lines + aisle + symbol: ~1h45m
- 52 lines: 3–4 hours, then 2–3 hours
- 200 stalls solo: ~8 hours
- Travel, prep and quoting: not included
The part you must pay attention to
The discounted $800 bid was about 74 cents a foot, not 80 — before symbols and aisles.
His closing story is a bid for 60 lines, three disabled-parking symbols and three access aisles, cut from about $950 to a flat $800, "which was still I think 80 cents per linear foot".
- Accepted bid — $800
- 60 lines × 18 ft — 1,080 ft
~74¢/ft
Even if every dollar went to lines, with symbols and aisles free
Sixty 18-foot lines is 1,080 feet. At 80 cents that is $864 for the lines alone, before three symbols, three aisles or paint. His own method from earlier in the video — lines at 80 cents plus about $80 for paint — would give roughly $944 for the lines and paint, which is almost exactly his original $950 draft. The $150 discount therefore took him below his stated rate, not to it. It is a small error and he flags his own uncertainty with "I think", but it is the one real bid described in detail, and it is the example a beginner is most likely to copy.
Everything else he calculates holds up. $7.20 and $14.40 a line are right; 500 lines at $14.40 is $7,200; 52 lines is $374.40 or $748.80, and adding $80 of paint gives $828.80. The 200-stall example — $1,440 for about eight hours — is right on the multiplication, though he calls it what "you can make", when it is revenue before paint and equipment. By his own paint ratio of about two and a half gallons per 54 lines, 200 lines would need roughly nine gallons. The point of his closing story stands — a reasonable bid wins work — but the discount cost more than he thought.
- HIS PER-LINE FIGURES
- 18 ft x $0.40 = $7.20
- 18 ft x $0.80 = $14.40
- 18 ft x $1.25 = $22.50
- THE 52-LINE QUOTE (checks out)
- 52 x $14.40 = $748.80
- + paint = $80.00
- Estimate = $828.80
- THE 60-LINE BID (does not)
- 60 x 18 ft = 1,080 ft
- 1,080 x $0.80 = $864
- + ~$80 paint (his rule) = $944
- His first draft = ~$950
- Accepted bid = $800
- $800 / 1,080 ft = ~74c/ft
- before 3 symbols + 3 aisles
The economics
Revenue per job is well evidenced. Margin per job is not addressed.
- Per-foot range — 40¢–$1.25 (up to $1.50 on small lots)
- Standard stall line — 18 ft
- 52-line quote with paint — $828.80
- Paint for ~52 lines — ~$60–$80
- 200 stalls solo — ~$1,440 in ~8 hours
- Gross per hour, 200-stall job — ~$180
- Dentist lot — ~$450 in ~1h45m
- Gross per hour, dentist lot — ~$257
- Revenue, job count, equipment, wages — Never stated
Checking the accepted 60-line bid
60 lines × 18 ft = 1,080 ft; $800 ÷ 1,080 ft ≈ $0.74 per foot
About 74 cents a foot even if symbols and aisles were free — below the 80 cents he believed it held
IncomeIdeaLab calculation from the creator’s own line count, line length and bid
He says "I think", so he presents the 80-cent figure as approximate. The comparison assumes all 60 lines are standard 18-foot stall lines, which is the assumption he uses throughout the video.
- Annual revenue or jobs per year
- Striping machine cost
- Helper wages
- Travel and prep costs
- Profit on any job
- How he wins leads in the first place
- He says 10 lines at $1.25 a foot "is like 200 bucks"; the exact figure is $225.
- He says "seven dollars per linear foot is not going to be feasible" for a small lot; from context he means $7.20 per line, not per foot.
- The 52-line lot is given as three to four hours of work, then a minute later as "a pretty good chunk of money for two to three hours". The difference moves the gross hourly rate from roughly $187–$250 to $250–$374 on $748.80.
- Gross-per-hour figures are ours, from his stated prices and durations, and exclude paint, helpers, travel and the machine.
Evidence status
Every substantive claim in the video.
- Operators charge 40¢ to $1.25 a foot — Creator — His market knowledge. Not independently checked.
- Standard stall line is 18 feet — Creator — Used consistently in every calculation.
- $7.20 / $14.40 / $22.50 per line — Creator — All correct.
- 500 lines at $14.40 = $7,200 — Creator — Correct.
- 52 lines: $374.40, $748.80, $828.80 with paint — Creator — All correct.
- Dentist lot for about $450 in 1h45m — Creator — Plausible; roughly double the per-foot price, as he argues.
- 200 stalls, ~8 hours, ~$1,440 — Creator — Multiplication right. It is revenue, not earnings.
- $800 bid "still I think 80 cents per linear foot" — Creator — Works out to ~74¢ before symbols and aisles.
- Lost bids early by overpricing — Creator — Candid; "about five or six times".
- Income, job volume, equipment cost — Nobody — Outside the video’s scope, and absent.
What is actually proven?
The quoting arithmetic, almost entirely.
- The per-foot method is explained and worked on screen.
- Every per-line and per-lot figure multiplies out correctly.
- He states the rate excludes paint, labour and prep.
- He admits losing bids by overpricing.
- The $800 bid is about 74¢ a foot, not 80¢.
- Two different durations are given for the same 52-line lot.
- What the business earns in a year.
What the headline doesn’t tell you
The title promises prices, and delivers them. Here is what sits around them.
- Lines only. — Symbols, arrows, aisles are extra.
- Rate excludes costs. — He says so himself.
- "You can make $1,400". — That is revenue.
- The $800 bid. — ~74¢, not 80¢.
- Two times for one lot. — 3–4 hours, then 2–3.
- Machine never priced. — Nor the helpers.
- No income figure. — Not what the video is about.
- One market. — Competitive Oklahoma rates.
Should you try it?
A usable quoting method from someone who learned it the hard way
Use his method and his warning about overpricing. Work out your own costs before you trust any rate.
- Arithmetic accuracy — 9 — Every calculator step checks out bar one bid.
- Delivery on the title — 9 — Asked what he charges; he shows it.
- Honesty about mistakes — 8 — Lost bids early by overpricing, and says so.
- Cost framing — 7 — Explicit that paint, labour and prep are excluded.
- Cost disclosure — 3 — Paint only; machine and wages never priced.
- Evidence of income — 1 — No revenue, volume or profit given.
- Beginner accessibility — 6 — Clear method; needs a machine and customers.
- If you are pricing your first striping jobs, this is a useful video. The per-foot method is simple, the 18-foot stall line gives you a standard unit, and his distinction between large and small lots is the most important thing to get right: at 40 cents a foot a big shopping centre pays well, but a ten-space lot pays almost nothing for the time it takes to set up the machine, which is why he charged a dentist about double the per-foot price.
- His warning about overpricing is worth taking seriously precisely because it runs against the usual advice in this genre. He started at a dollar a foot after hearing others charged $1.50, and lost large jobs repeatedly before adjusting. In a competitive market, a quote that looks unreasonable sends the customer for a second opinion and you never hear back.
- Do the arithmetic yourself on every bid. His one detailed discount — $950 down to $800 for 60 lines, three symbols and three aisles — felt like 80 cents a foot and was in fact about 74 cents before the extras. Multiplying lines by 18 by the rate before you discount takes ten seconds and tells you exactly what you are giving away.
- Finally, remember what the video leaves out. It prices lines, not a business. There is no figure for the striping machine, the helpers he mentions, travel, prep or insurance, and no indication of how many jobs a year he wins. A $1,440 day on a 200-stall lot is revenue; what remains after paint, the machine and a helper is for you to work out.
Passive or automated?
Automation
A machine lays the paint; people set up, walk it and quote the job.
Passive potential
Paid per job, on site.
Striping is a field trade paid per job. Every lot has to be measured, quoted, prepared, laid out and painted in person, and the creator describes helpers setting up the machine even on a ten-line lot. Restriping creates repeat customers, which he values — "it's not just about customer acquisition but it's about customer retention" — but each repeat is another job on site. Nothing here is passive.
- Measuring and counting lines
- Writing and adjusting bids
- Setting up and running the striping machine
- Prep — sweeping or power washing
- Managing helpers on site
Recommended beginner experiment
Quote accurately, then learn your real costs.
- Buy or borrow a measuring wheel. — His first equipment tip.
- Count lines from an aerial photo. — Multiply by 18 feet.
- Start at 40–80¢ on large lots. — His competitive-market range.
- Set a floor for small lots. — His dentist lot was ~$450.
- Add paint as a line item. — ~2–2.5 gallons per ~52 lines.
- Check every discount against the rate. — His $800 bid was ~74¢.
- Time every job. — Turn quotes into an hourly figure.
- Price your machine and helper. — The video never does.
Our verdict: 7/10
A pricing method that shows its working — and one bid that doesn’t add up every calculator step checks out except the discount he uses as proof
Credited for delivering exactly what the title promises; for a clear per-foot method with a standard 18-foot unit; for working several quotes aloud, all of which we could verify; for stating plainly that the rate excludes paint, labour and prep; for explaining why small lots must be priced differently; and for admitting he lost bids early by overpricing. Marked down because the one real discounted bid described — $800 for 60 lines, three symbols and three aisles — works out to about 74 cents a foot rather than the 80 cents he believed; because the same 52-line lot is given two different durations; because a $1,440 day is described as what "you can make" when it is revenue; and because no machine, wage or annual income figure is given.
This is one of the more checkable pricing videos we have reviewed, because the creator does his sums aloud. Striping is priced per linear foot, a stall line is 18 feet, and the range he sees runs from 40 cents to $1.25. At 80 cents a line is $14.40, a 500-line shopping centre is $7,200 before costs, and a real 52-line lot comes to $748.80 plus about $80 of paint, or $828.80. All of that is correct. His reasoning about lot size is sound — a ten-space dentist's lot went for about $450 because the per-foot rate would not cover set-up — and his central lesson, that he lost work early by charging too much, is honest and useful in a competitive market. He is also clear that the rate is not profit: it excludes paint, labour and prep. The one error is in the story meant to prove his point. He cut a 60-line bid from about $950 to $800 and thought it still held 80 cents a foot; 1,080 feet at 80 cents is $864 before the symbols and aisles, so the accepted bid was nearer 74 cents, and the original $950 was almost exactly what his own method produces. It is a small slip, and he hedges it with "I think". Beyond that, the video stays inside its title: it does not claim an income, and it gives none, along with no figure for the machine or the helpers. Use the method. Do your own arithmetic before you discount.
- Per-foot range — 40¢–$1.25
- Per line at 80¢ — $14.40
- 52-line estimate — $828.80
- Dentist lot — ~$450
- $800 bid, actual rate — ~74¢/ft
- Equipment and wages — Never stated
- Annual income — Never stated
- Beginner suitability — Good for quoting; costs are yours to find