IncomeIdeaLab

Local Services / Mobile Welding · Claim Review

Fact-check of a YouTube video by Self Employed Moron

“Why you should take on EVERY welding job!”

What we found: One Stair Step at a Minimum Charge, Twenty More Expected at About $150 Each: The Follow-Up Work Is Projected and the Job's Costs Are Not Stated

A mobile welder replaces one apartment step and says the customer has ten more on order and ten more at another building. On our arithmetic that is about $3,000 if it arrives; the minimum charge, time on site and materials are not given.

Published 11 November 2026 · Our rating 5/10 · Evidence low · 7 min read

Made this video? Ratings rest on what the video shows. Email info@incomeidealab.com with the subject “Evidence for review: Why you should take on EVERY welding job!” and your dashboards or statements, and we will review the rating. Open in your email app.

Thumbnail for “Why you should take on EVERY welding job!”

Source: Why you should take on EVERY welding job! (YouTube video)

  • ~$150 Price per step
  • 20 Steps expected
  • ~$3,000 If all 20 arrive
  • Not stated Today's charge and costs

The claim

That taking small welding jobs leads to larger ones: one broken stair step today, about twenty more at roughly $150 each to follow, and that "most of my $10,000 jobs plus came from little little jobs like this".

Self Employed Moron — YouTube, 26 October 2026

  • Today's job — One apartment stair step, at "my minimum charge"
  • Minimum charge amount — Not stated
  • Steps on order at this building — 10, "he's going to call me back"
  • Steps at another building in the complex — 10
  • Price per step — "I probably charge … 150 bucks per step"
  • Value of 20 steps — ~$3,000
  • Larger jobs — "Most of my $10,000 jobs plus came from little jobs"
  • Time on site, materials, travel — Not stated

What is this income idea?

Run a mobile welding business from a truck, and treat every small repair call as a way into a customer's larger future work.

  • The job is an emergency call from a long-time customer: a broken steel stair step at an apartment complex. The creator brings two ladders, an extra 50 ft of welding lead for 100 ft in total, and 4x4 timbers, and stick welds a new "butterfly" step into place.
  • The method is explained in detail. The old plates are cut off and cleaned of paint and burrs, 4x4s are clamped across the neighbouring step so the new step cannot fall onto the concrete below, and the new step is set to match the rise and run of the existing steps — about 7¾ and 9½ inches here — and levelled both ways with a slight fall for water.
  • The creator says the new step shape is stronger and believes it is now required by code where they work, in Oregon. The customer chose to keep an old plate in place for appearance.
  • The business point comes from a conversation with the maintenance manager. Ten more steps are on order, the manager will call back when they arrive, and ten more steps need replacing at another building in the same complex. The creator says they "probably charge" about $150 per step for this type of work.
  • The creator adds that "most of my $10,000 jobs plus came from little little jobs like this", and advises new welders to answer the phone, set a minimum charge that makes some money, and not set it so high that customers do not call back.
  • The creator is also candid that the manager says work is slowing for the season, and that filming was limited because the manager stayed on site for safety.

Take the small call, do it well, and the same customer may hand you the bigger job next.

  • Emergency call — Long-time customer
  • Replace one step — At a minimum charge
  • Talk to the manager — Future work comes up
  • 10 steps on order — Call back expected
  • 10 more elsewhere — Same complex
  • ~$150 per step — ~$3,000 if all arrive
  • $10,000+ jobs — "Most" began this way

A clear example of a small job leading to a larger one, at the point before the larger one is done.

Small jobs as a pipeline, shown before the pipeline pays

The lesson underneath the number

  • The argument in this video is one most trades owners would recognise: the customer who calls about one broken step is the customer who will call about the next twenty, provided the first job is done well and priced fairly. The creator makes it concrete. One step today, ten on order, ten more in another building, at a price per step the creator states.
  • The value of the video is that it shows the moment where that pipeline is created, rather than a finished success. That is also its limit as evidence. The twenty steps are expected, the manager says the season is slowing, and the larger claim — that most $10,000-plus jobs came from small ones — is the creator's account of past work that is not itemised here.
  • The pricing advice is balanced. A minimum charge should make some money, and should not be set so high that the customer stops calling. That is the right tension for a new trades business, and the video offers no formula for it; it does not give its own minimum either.
  • The safety section is worth as much as the business lesson. Replacing a structural step on a staircase people use, with concrete below, is dangerous work, and the creator explains exactly how they stop a new step falling: two clamped 4x4s across the neighbouring step before the new one goes in.

You got to answer the phone, take on these little jobs and they can turn into bigger jobs.

The creator, to new mobile welders

The job, as the video describes it

How to replace a steel stair step on an occupied building.

No time, material cost or charge is given for today's step.

  • Bring enough reach — Two ladders, because at apartments one often has to be run over another staircase, and an extra 50 ft of lead for 100 ft in total.
  • Cut out the old step — Cut the welds on the end plate and the plate welded to the main beam. Here the customer kept one old plate for appearance only.
  • Clean up for the new step and for safety — Remove old paint and burrs so the new step slides in and no sharp edge is left where a child could cut themselves.
  • Clamp 4x4s before lifting the new step — The timbers stop the new step falling off the stringer onto the concrete below, which the creator says could damage lower steps or kill someone.
  • Match the existing steps — Use the neighbouring steps as the reference for nose-to-nose distance and height, level both ways, and allow a slight fall so water runs off.
  • Weld and add spacers — Stick weld the step to the beam and add small spacers where the new step does not match the stringer angle.
  • Ask about the next job — The conversation with the maintenance manager is where the twenty further steps come up. The creator calls it the point of the video.

The business model

Per-job charges for mobile welding repairs, with a minimum charge for small jobs and per-unit pricing such as about $150 per stair step.

Property and maintenance managers at apartment complexes, among other repeat commercial customers.

Fast, safe on-site repairs, including emergency calls, by someone the customer already trusts.

Repeat customers and word of mouth; answering the phone for small jobs that lead to larger ones.

  • Truck and fuel — Not priced
  • Welder, leads, ladders, timbers, clamps — Shown in use; not priced
  • Rod and consumables — Rod type named; cost not given
  • Steel steps — Ordered by the customer, by the creator's account
  • Liability insurance — Not mentioned
  • Set-up and travel time — Not stated

The customer appears to buy the replacement steps, so the $150 is mainly for labour and consumables. That is our reading of "they've got 10 steps on order"; the video does not say who pays for the steel.

What you would actually need

Money

Not discussed. The creator arrives with a work truck, ladders, extended welding leads, 4x4s, clamps and a stick welder.

A mobile welding setup is a real capital outlay: a truck able to carry a welder, leads, ladders and safety gear, plus liability insurance for working on buildings people use. None of it is priced, and neither is the minimum charge that is meant to cover it on a small job.

Named or implied, not priced

  • Work truck
  • Stick welder and at least 100 ft of lead
  • Two ladders, 4x4 timbers, clamps, levels
  • Grinder and cutting tools
  • Welding rod and consumables
  • Liability insurance for work on occupied buildings
  • Fuel and travel to each call

Time

The creator says to answer the phone and take small jobs, because larger ones follow. Time on this job is not stated.

The skill is the largest time cost. Cutting, fitting, levelling and welding structural steel safely on a staircase people use is trade work learned over years. A minimum charge on a one-step job has to cover travel, set-up and clean-up, which can take longer than the weld.

Where the time goes

  • Learning to weld structural steel
  • Travel to and from each call
  • Setting up ladders, leads and supports
  • Cutting out and cleaning up
  • Fitting, levelling and welding
  • Waiting for the customer's steps to arrive

The part you must pay attention to

The bigger job is expected, not done.

Today's work is one step "for my minimum charge". The twenty further steps depend on parts arriving and the manager calling back.

  • Steps expected — 20
  • Price per step — ~$150

~$3,000

Gross, if all twenty arrive at that price

The assumption the whole lesson rests on is the call-back. Ten steps are "on order" and the manager is "going to call me back"; ten more are at another building. In the same conversation, the manager says the last couple of weeks have been slow and "it's just that time of year". The creator's argument is about the long run — "most" of their $10,000-plus jobs began as small ones — and that is the creator's own account across years of work, which could not be checked from the video. No number of small jobs per large one is given.

If all twenty steps come through at about $150 each, the follow-up is worth about $3,000 gross on our arithmetic. That is a good return on one minimum-charge visit. It is not yet earned in the video, and the costs against it — travel, rod, gas or electricity for cutting, set-up time per visit, insurance — are not given. The creator says "probably" about the price. The advice that comes with it is careful: set a minimum charge that makes some money, and do not set it so high that the customer stops calling.

  • TODAY
  • Steps replaced 1
  • Charge "minimum" (amount not stated)
  • EXPECTED
  • On order, this building 10
  • Another building 10
  • Total 20
  • x ~$150 per step
  • ----------------------------
  • ~$3,000 gross, if it arrives
  • AGAINST IT (not stated)
  • Travel per visit ???
  • Rod and consumables ???
  • Set-up and clean-up time ???
  • Insurance ???
  • THE LONG RUN
  • "Most" $10,000+ jobs
  • began as small ones
  • -> creator's own account

The economics

One price, one expected order, and no cost side.

  • Today's charge — Minimum charge, amount not stated
  • Price per step — ~$150
  • Steps on order — 10
  • Steps at another building — 10
  • Value of 20 steps — ~$3,000
  • Size of larger jobs — $10,000+
  • Time on site, travel, materials — Not stated

Value of the follow-up work

(10 + 10) steps × ~$150 = ~$3,000

About $3,000 gross if all twenty steps are ordered and done at that price

IncomeIdeaLab calculation from the figures stated in the video

The creator says "probably" about the price, the steps depend on the customer's order and call-back, and the twenty may be done over several visits, each with its own travel and set-up. No cost or time figure is given, so the net value could not be worked out from the video.

  • The minimum charge for today's job
  • Hours on site for one step
  • Material and consumable cost per step
  • Travel cost per visit
  • Insurance cost
  • How many small jobs lead to one $10,000-plus job
  • The creator says the new step design is "I believe" a code requirement in Oregon. That is stated with a hedge and could not be checked from the video.
  • The manager's remark that work is slow "that time of year" sits in the same exchange as the promise of future steps. The creator includes it.
  • No course, product, sponsor or affiliate link is promoted in the video.

Evidence status

Every substantive claim in the video.

  • One step replaced at the minimum charge — Creator — The work is described; the charge is not given.
  • Ten more steps on order — Creator, after talking to the manager — Depends on a call-back.
  • Ten more steps at another building — Creator — Expected work.
  • About $150 per step — Creator — Stated as "probably". A usable reference price.
  • Twenty steps worth ~$3,000 — IncomeIdeaLab — Gross, if it all arrives.
  • Most $10,000-plus jobs came from small jobs — Creator — Could not be checked from the video. No examples itemised.
  • New step design is a code requirement in Oregon — Creator, "I believe" — Hedged by the creator.
  • Clamped 4x4s stop the new step falling — Creator — A specific, sensible safety method.
  • Costs and time for the job — Nobody — Not mentioned.

What is actually proven?

The method is specific. The payoff is ahead of the video.

  • The repair method and safety set-up are described step by step.
  • A per-step price for this type of work is given.
  • Twenty further steps are expected from the same customer.
  • Those steps would be worth about $3,000 gross at the stated price.
  • The creator includes the manager's remark that work is slowing.
  • Today's minimum charge.
  • Time, materials and travel for the job.

What the headline doesn’t tell you

A good lesson, told at the start of the story.

  • The twenty steps are expected. — Not yet done.
  • Today was a minimum charge. — Amount not given.
  • $150 is "probably". — The creator's usual price.
  • $3,000 is gross. — Our arithmetic, before costs.
  • The season is slowing. — The manager says so.
  • $10,000 jobs are the long run. — From the creator's experience.
  • This is skilled work. — Structural welding on stairs.
  • Nothing is being sold. — No course or link promoted.

Should you try it?

Good advice for someone who can already weld

The business lesson applies to any trade. The work itself needs real welding skill and insurance.

  • Practical usefulness of the advice — 7 — Answer the phone, price the minimum sensibly.
  • Safety detail — 8 — How to stop a step falling is explained.
  • Evidence for the follow-up income — 3 — Expected, with a stated price.
  • Cost disclosure — 1 — No cost or time is given.
  • Candour — 7 — Includes the slow-season remark.
  • Beginner accessibility — 3 — Requires a welding trade and a truck.
  • If you already weld and are starting a mobile business, the advice here is sound and specific. Small repair calls from property managers are a reliable way to become the person they call for larger work, and a fair minimum charge keeps those calls coming while still paying for the visit.
  • Work out what your minimum charge has to cover before you set it: travel both ways, set-up, cutting and clean-up, consumables, and your insurance. The video does not give its own number, so build yours from your costs.
  • Treat the $3,000 as what it is: a good-looking order that has not yet arrived. Whether the steps come at all depends on the customer, and the customer says the season is slowing.
  • If you cannot already weld structural steel, this is a trade to learn first. The safety section shows why: the consequence of a mistake on a staircase is not a returned product.

Passive or automated?

Automation

Every weld is done on site by hand.

Passive potential

Income is time on the job.

This is a trade. Each job is travelled to, set up, cut, fitted and welded by the person being paid, and the creator does not describe it any other way. Repeat customers reduce the time spent finding work, which is the point of the video, but they do not reduce the time spent doing it.

  • Every cut, fit and weld
  • Travel and set-up on site
  • Safety supports on live staircases
  • Talking to customers about future work
  • Pricing each job

Recommended beginner experiment

For a welder starting a mobile business.

  • Cost one visit end to end. — Travel, set-up, consumables, time.
  • Set a minimum charge from that. — With some margin, not a lot.
  • Get liability insurance. — Before working on occupied buildings.
  • Introduce yourself to property managers. — Apartments, maintenance teams.
  • Take the small calls. — And do them carefully.
  • Ask about upcoming work. — As the creator does here.
  • Track where big jobs came from. — Test the advice on your own data.

Our verdict: 5/10

A sound trades lesson, shown before the bigger job pays with a stated price per step and no figure for today's charge or costs

Credited for a clear, specific example of a small job creating larger expected work; for stating a per-step price for this type of repair; for balanced advice on setting a minimum charge; for a detailed explanation of how to replace a structural step safely; and for including the customer's remark that work is slowing for the season. Marked down because the twenty further steps are expected rather than done; because today's minimum charge, time on site and costs are not stated; and because the link from small jobs to $10,000-plus jobs is the creator's own account with no examples itemised.

This is a short, practical video from a working mobile welder, and its argument is one most trades owners would agree with: answer the phone for small jobs, do them well, and the same customer becomes the source of larger ones. The example is concrete. One broken apartment step is replaced for a minimum charge, the maintenance manager mentions ten more steps on order and ten more at another building, and the creator says they would probably charge about $150 per step — about $3,000 on our arithmetic if all twenty come through. The safety method is explained carefully, including how two clamped 4x4s keep a new step from falling to the concrete below. As evidence for income the video is at an early point in the story. The twenty steps are expected rather than done, the manager says business is slowing for the season, and today's charge, time on site and material costs are not given. The creator's wider claim, that most of their $10,000-plus jobs began as small ones, comes from experience the video does not itemise. Take the pricing and safety advice; judge the follow-up income when it is invoiced.

  • Price per step — ~$150
  • Steps expected — 20
  • Value if all arrive — ~$3,000
  • Today's charge — Not stated
  • Costs and time — Not stated
  • $10,000+ jobs from small ones — "Most"
  • Beginner suitability — For existing welders

Sources

Topics: Mobile Welding, Trades, Small Jobs, Repeat Customers, Pricing