Fact-check of a YouTube video by Tyler Link

“How to Estimate Projects: 5 Simple Steps to Profitable Pricing”

What we found: A Contractor Pricing Formula That Checks Out, Until Fewer Than 74% of Hours Are Sold

Real overhead, a real labour burden and a $95 hourly rate that recomputes exactly. What the method does not say is that the rate only works if every sellable hour is billed.

Published 28 September 2026 · Our rating 7/10 · Evidence medium · 10 min read

Made this video? Ratings rest on what the video shows. Email info@incomeidealab.com with the subject “Evidence for review: How to Estimate Projects: 5 Simple Steps to Profitable Pricing” and your dashboards or statements, and we will review the rating. Open in your email app.

Thumbnail for “How to Estimate Projects: 5 Simple Steps to Profitable Pricing”

Source: How to Estimate Projects: 5 Simple Steps to Profitable Pricing (YouTube video)

  • $95/hr Charge-out rate
  • 34,200 Sellable hours
  • ~74% Labour break-even
  • $500k+ Stated 2023 income

The claim

That pricing jobs from overhead per man-hour, burdened wages and a markup — rather than price per square foot — "almost guarantees a true profit", and took their company from losing money to past $4 million in revenue.

Tyler Link — YouTube, 31 October 2023

  • Company revenue — Past $4 million
  • Income in 2023 — Over $500,000
  • Annual overhead — ~$1.55 million (back-solved from $45.35 × 34,200)
  • Sellable man-hours per year — 34,200
  • Implied field staff — 19
  • Overhead per man-hour — $45.35
  • Burdened wage — $28 × 1.2 = $33.60
  • Full cost per man-hour — $78.95
  • Charge-out rate at 20% markup — $95
  • Labour break-even utilisation — ~74% of sellable hours
  • Break-even if crew wages are paid for every available hour — ~83% ($78.95 ÷ $95)
  • Flip chart on screen at 5:26 — $45.35 overhead, $78.95 total cost, × 1.2, $95 per hour

What is this income idea?

Stop pricing contracting work per square foot. Work out what every hour of field labour really costs the business, add a markup, and price each job by the man-hours it will take.

  • They run a concrete and landscaping company in Colorado and say this method took it from losing money to profitable, then "scaling past $4 million and producing over $500,000 of income in 2023." The video went up on 31 October 2023.
  • Step one is to total the overhead — everything paid whether a crew is working or not. Their list is unusually complete: unbillable time such as oil changes and shop clean-up, small equipment, licences, safety gear, rentals, vehicle and business insurance, indirect salary, accounting, rent, marketing, fuel, software, interest, depreciation, bad debt, warranties, legal fees and vehicle repairs. Back-solved from their per-hour figure, the total is about $1.55 million a year (our arithmetic).
  • Step two spreads that overhead across the hours the business can actually sell: field staff × weeks worked (40 in Colorado) × hours per week (about 45). For their company that is 34,200 hours, and the overhead works out at $45.35 for every man-hour worked.
  • Step three is the true cost of a field worker. A $28 wage carries payroll taxes and insurance — their labour burden is 20% — so each hour costs $33.60.
  • Step four adds the two: $78.95 per man-hour, which they mark up by 20% to a $95 charge-out rate. They point out that most of that is overhead, not wages.
  • Step five prices a sample 1,000 sq ft patio: three crew, ten-hour days, three days, 90 man-hours, plus $3,400 of materials marked up 20%. Our recomputation from those inputs is below. If the job took two days instead of three, only the man-hours change.

Know what an hour of crew time truly costs you, add a margin, and price by hours rather than by square foot — provided the crews stay busy.

  • Total the overhead — Everything, including bad debt
  • Count sellable hours — Staff × 40 wks × 45 hrs
  • Overhead per hour — $45.35
  • Burdened wage — $28 × 1.2 = $33.60
  • Add, then mark up — $78.95 × 1.2 = $95
  • Price by man-hours — Plus materials × 1.2

A sound costing method. Its accuracy depends entirely on how many of the counted hours are actually sold.

The formula is right. The denominator is optimistic.

The lesson underneath the number

  • Most pricing advice aimed at trades stops at "know your numbers". This video actually shows them: an itemised overhead list that includes bad debt and depreciation, a 20% labour burden, a markup rather than a vague margin, and a charge-out rate that recomputes to the cent. They also admit the old approach — copying competitors’ square-foot prices — is why their company was once losing money. That is a stronger basis for advice than a revenue figure.
  • The single decision that matters most in the method is also the one presented most casually: divide overhead by 34,200 hours, the maximum the crews could possibly work. Overhead does not shrink when a crew sits idle, so every unsold hour leaves $45.35 unrecovered. By our arithmetic, their labour breaks even only once about 74% of those hours are billed. Near full utilisation, the formula produces something close to their stated $500,000; at 80% it produces a fraction of that.
  • For an established company with a full calendar, that may be fine, and they may well be running close to capacity. For the beginner watching the video, it is the difference between a bid that looks profitable and a business that is. The correction is small — divide by expected billed hours — and it makes every bid a little higher and a lot safer.
  • The headline figures deserve one note. "Over $500,000 of income in 2023" was said in a video published on 31 October 2023, so at best it covers ten months or includes a forecast. "Income" is not defined — it could be profit, owner’s pay or something else — and none of the revenue or income figures is shown. The method is demonstrated; the results are asserted.

That is the maximum amount of hours that I’m allowed to sell.

Their description of the 34,200 hours — and the reason the rate needs a buffer

The method, as they give it

Five steps, with their own numbers at each one.

Figures are as said and shown in the video. The rate calculation is screen-shared as a spreadsheet and written on a flip chart at 5:26 (overhead per hour $45.35, total cost per hour $78.95, profit multiplier × 1.2, price per hour $95). The sample bid totals are recomputed from their stated inputs.

  • List every overhead cost, including the ones people forget — Unbillable time, bad debt, warranties, depreciation and interest are all on the list. Including bad debt — "no matter how good of work that you do you’re bound to… get people that don’t pay" — is a mark of someone who has actually run the numbers.
  • Divide overhead by sellable man-hours — Field staff × 40 weeks × 45 hours gives 34,200 hours. Dividing 34,200 by 40 × 45 = 1,800 hours per worker implies 19 field staff — our derivation; they do not give a head count.
  • Burden the wage — $28 × 1.2 = $33.60. The 20% burden is their Colorado figure for taxes and unemployment insurance, and they say correctly that it varies by jurisdiction.
  • Add overhead and direct cost — $45.35 + $33.60 = $78.95 — their figure, and it recomputes exactly.
  • Mark up by 20% — $78.95 × 1.2 = $94.74, which they round to $95. A 20% markup on cost is a 16.7% margin on price — the two are often confused, and they use the word "markup" correctly.
  • Price the job by man-hours, not square feet — Three crew × 10 hours × 3 days = 90 man-hours; materials of $3,400 marked up 20%. If the job can be done in two days, the man-hours drop to 60 and the price follows. The logic is sound.

The business model

Concrete and landscaping jobs priced by estimated man-hours at $95 each, plus materials marked up 20%.

Residential clients in Colorado buying patios and hardscape work.

Bids built from true cost, so each job is priced to recover overhead and earn a margin.

Not discussed. Marketing appears only as an overhead line.

  • Overhead — ~$1.55M a year by back-solving; itemised in unusual detail
  • Field wages — $28 an hour average, 20% burden
  • Materials — Passed through at a 20% markup
  • Idle crew time — The cost the formula does not show — overhead is spread over maximum hours
  • Owner’s pay — Not stated whether it sits in overhead or in the $500,000 income

This is the rare video that puts real overhead on screen. The one cost it does not model is the gap between hours available and hours sold.

What you would actually need

Money

No start-up figure. The method is presented as something any contractor can apply to their own numbers.

The method itself costs nothing but a spreadsheet and honest bookkeeping. What it cannot do is invent the inputs: a new contractor without a year of cost records has to estimate overhead, and an error there flows into every bid.

What the formula needs from you

  • A full year of overhead costs, itemised
  • An honest count of weeks and hours crews can work
  • Your local payroll burden percentage
  • Material costs by job
  • A realistic estimate of man-hours per job
  • Mentorship and custom spreadsheets are offered; price not stated

Time

Once set up, the next video promises bids "in under 30 seconds".

The arithmetic per bid is quick. The hard part is estimating man-hours accurately for each job, which is judgement built over years — and the whole method depends on it.

Where the effort goes

  • Building the overhead list the first time
  • Updating it as costs change
  • Estimating man-hours per job accurately
  • Tracking actual hours against estimates
  • Keeping crews booked enough to sell the hours

The part you must pay attention to

The $45.35 overhead rate only recovers overhead if every one of the 34,200 hours is sold.

They describe 34,200 as "the maximum amount of hours that I’m allowed to sell", then divide overhead by that maximum. That makes the rate correct at full utilisation and short at anything less.

  • Charge-out rate — $95
  • Burdened wage — $33.60
  • Contribution per hour sold — $61.40

~25,260 hours (~74%)

Hours needed to cover ~$1.55M of overhead

Each billed hour contributes $95 minus $33.60 of wages, or $61.40, towards overhead. With overhead of about $1.55 million — back-solved from their own $45.35 × 34,200 (our arithmetic) — labour breaks even at roughly 25,260 billed hours, or about 74% of the maximum. Sell every hour and labour earns about $549,000 over costs, close to their stated income. Sell 90% and that falls to about $339,000; sell 80% and it falls to about $129,000. Material markup adds to all of these, and they do not give a material volume. Unbillable time is already inside their overhead, which helps, but weather days, gaps between jobs and jobs that finish early all reduce billed hours in a way the formula does not see. The 74% assumes crews are paid only for hours that are billed; if wages are paid for every available hour, the whole $78.95 is a fixed cost and break-even rises to about 83% ($78.95 ÷ $95, our arithmetic).

This does not make the method wrong. Pricing from true cost is far better than copying a competitor’s square-foot rate, and they say plainly that the square-foot approach is why they used to lose money. But "almost guarantee a true profit" holds only at high utilisation, and a new contractor with thin demand would under-recover overhead on every job while believing each bid was profitable. The fix is simple and they do not state it: divide overhead by the hours you realistically expect to bill, not the hours you could.

  • HIS RATE, RECOMPUTED
  • Sellable hours 34,200
  • Overhead / hour $45.35
  • Overhead (back-solved) ~$1.551M
  • $28 x 1.2 = $33.60
  • $45.35 + $33.60 = $78.95
  • $78.95 x 1.2 = $94.74 -> $95
  • UTILISATION (labour only, ours)
  • 100% 34,200 h ~ +$549k
  • 90% 30,780 h ~ +$339k
  • 80% 27,360 h ~ +$129k
  • 74% ~25,260 h ~ break-even
  • 83% if wages are paid on
  • every available hour
  • THE SAMPLE PATIO, RECOMPUTED
  • 3 x 10 h x 3 d = 90 man-hours
  • 90 x $95 = $8,550 labour
  • $3,400 x 1.2 = $4,080 material
  • Total = $12,630

The economics

The rate is verifiable arithmetic. The results are not shown.

  • Overhead per man-hour — $45.35
  • Sellable hours — 34,200
  • Overhead (back-solved) — ~$1,551,000
  • Burdened wage — $33.60
  • Charge-out rate — $95
  • Margin on price at 20% markup — ~16.7%
  • Maximum labour revenue — ~$3.25M
  • Stated company revenue — Past $4M
  • Stated 2023 income — Over $500,000

Labour break-even

~$1,551,000 overhead ÷ ($95 − $33.60) per billed hour = ~25,260 hours = ~74% of 34,200

Below roughly 74% utilisation, labour loses money before material markup is counted

IncomeIdeaLab calculation from the rate, wage and hours stated in the video

Overhead is back-solved from the per-hour figure (our arithmetic). Material markup adds profit not included here, and their company may run close to full utilisation — the video does not say.

  • Actual utilisation — how many of the 34,200 hours are billed
  • What "income" means in "$500,000 of income"
  • Whether owner pay sits inside overhead
  • Material volume, and so the profit from the 20% material markup
  • Price of the mentorship and spreadsheets offered
  • At full utilisation, 34,200 hours × $95 is about $3.25 million of labour revenue; with materials at cost plus 20%, "past $4 million" is arithmetically plausible.
  • At full utilisation, labour earns 34,200 × ($95 − $78.95) ≈ $549,000 over all costs — close to their "over $500,000", which suggests the company runs near capacity or that the figure is a full-utilisation estimate.
  • The sample bid is recomputed from their inputs: 90 × $95 = $8,550 labour, $3,400 × 1.2 = $4,080 materials, $12,630 total, about $12.63 per square foot (our arithmetic).
  • The flip chart on screen at 5:26 shows the rate steps as the creator wrote them: overhead per hour $45.35 (row partly cropped), total cost per hour $78.95, profit multiplier × 1.2, price per hour $95. $78.95 × 1.2 = $94.74 (our arithmetic), rounded to $95. No company revenue or income figure is on the chart.
  • The two-day version, 60 man-hours, brings labour to $5,700 — consistent with their "about 6,000".
  • "GPP" is never spelled out.

Evidence status

Every substantive claim in the video.

  • Company scaled past $4 million — Creator — Arithmetically plausible from their rate and hours. Not on the flip chart or spreadsheet shown.
  • Over $500,000 of income in 2023 — Creator — Said in October 2023; "income" undefined.
  • Was losing money before this method — Creator — An admission, volunteered.
  • Overhead of $45.35 per man-hour — Creator; flip chart on screen at 5:26 — Consistent with ~$1.55M over 34,200 hours.
  • Burdened wage $33.60 — Creator — $28 × 1.2 recomputes.
  • Full cost $78.95; charge-out $95 — Creator; flip chart on screen — Both recompute.
  • Sample patio bid totals — Creator — Recomputed from the stated inputs as $12,630.
  • Method "almost guarantees a true profit" — Creator — Only at high utilisation — ~74% to break even on labour, ~83% if wages are paid on idle hours.

What is actually proven?

The costing method is transparent. The business results are not.

  • An itemised overhead list and a worked hourly-rate calculation are shown on screen.
  • Every step from $45.35 to $95 recomputes from their inputs.
  • Labour breaks even at about 74% of sellable hours.
  • The flip chart on screen shows $45.35, $78.95, × 1.2 and $95 per hour.
  • The sample patio totals $12,630 from their inputs.
  • Revenue past $4 million and income over $500,000.
  • Actual utilisation, and what "income" includes.

What the headline doesn’t tell you

Good method, one unstated assumption.

  • Overhead is spread over maximum hours. — Idle time is unrecovered.
  • Break-even is ~74% utilisation. — Our arithmetic, labour only.
  • 20% markup is 16.7% margin. — They use the terms correctly.
  • "Income in 2023" in October. — Partial year or forecast.
  • "Income" is undefined. — Profit? Owner pay?
  • ~83% if crews are paid idle. — Our arithmetic: $78.95 ÷ $95.
  • Man-hour estimates carry the risk. — The formula cannot fix a bad guess.
  • Mentorship is unpriced. — Link in the description.

Should you try it?

Yes — with a realistic hours figure

The costing method is one of the most useful things in this genre. Replace their maximum-hours denominator with the hours you expect to bill.

  • Transparency of inputs — 9 — Real overhead items, burden, markup and hours on screen.
  • Arithmetic accuracy — 9 — The rate recomputes exactly.
  • Honesty about past failure — 7 — Admits the company once lost money on square-foot pricing.
  • Treatment of utilisation — 3 — Overhead is spread over the maximum possible hours.
  • Evidence for results — 3 — Revenue and income asserted, not shown.
  • Clarity of the sample bid — 5 — Inputs are clear; recompute the totals from them.
  • Beginner accessibility — 6 — Easy to apply; the inputs need real records.
  • If you run a trade business, build this spreadsheet. List every cost you pay whether or not a crew is working — their list is a good template, and the inclusion of bad debt, warranties and depreciation will catch costs most people forget. Add your real payroll burden to wages. Mark up the total. That alone will stop you pricing below cost.
  • Then change one thing. Instead of dividing overhead by every hour your crews could work, divide by the hours you honestly expect to bill. If you think you will sell 80% of available hours, your overhead rate rises from $45.35 to about $56.69 in their example, and your bids go up with it. That buffer is what turns "priced to cover overhead" into "actually covers overhead".
  • Recompute the sample bid yourself. Their inputs — 90 man-hours at $95 and $3,400 of materials marked up 20% — produce $12,630 (our arithmetic).
  • Finally, do not read "$500,000 of income" as what the method produces. It was said before the year ended, it is not defined, and it matches what their rate would yield only if nearly every hour is sold.

Passive or automated?

Automation

A spreadsheet speeds up bidding; the work is crews on site.

Passive potential

Revenue is billed man-hours by definition.

The method is about pricing labour, so nothing here is passive: every dollar of revenue is an hour of crew time. A spreadsheet makes the bid itself fast, and the next video promises bids "in under 30 seconds", but estimating how many man-hours a job will take, managing a crew of around nineteen, and keeping the calendar full enough to sell the hours are all continuous human work. The business model is a contracting company, not an income stream.

  • Estimating man-hours for each job
  • Running field crews
  • Keeping crews booked to sell the hours
  • Maintaining the overhead figures
  • Collecting payment and managing bad debt

Recommended beginner experiment

Build the rate, then stress-test it.

  • List a year of overhead. — Use their categories as a checklist.
  • Find your payroll burden. — Theirs is 20%; yours will differ.
  • Estimate billable hours honestly. — Not the maximum.
  • Compute cost per man-hour. — Overhead ÷ billable hours + burdened wage.
  • Choose a markup. — Remember 20% markup is 16.7% margin.
  • Track actual hours per job. — Your estimates are the real risk.
  • Recheck utilisation quarterly. — Re-price if it slips.

Our verdict: 7/10

A transparent pricing method with one optimistic assumption every hour counted as sellable is assumed to be sold

Credited for showing real overhead items, a real labour burden and a real markup rather than generic advice; for an hourly-rate calculation that recomputes to the cent from $45.35 of overhead and a $33.60 burdened wage to a $95 charge-out rate; for including bad debt, depreciation and unbillable time in overhead; for using "markup" correctly; and for admitting the company used to lose money pricing by the square foot. Marked down because overhead is spread across the maximum 34,200 hours, so the rate only recovers it at full utilisation — labour breaks even at about 74% by our arithmetic, or about 83% if crews are paid for unsold hours; because "over $500,000 of income in 2023" was stated in October 2023 and "income" is undefined; and because revenue and income are asserted rather than shown — the flip chart and spreadsheet on screen cover the rate, not the company’s results.

This is one of the more useful pricing videos in the trades genre because it shows its working. The overhead list is thorough — unbillable time, bad debt, warranties and depreciation included — the labour burden is stated and explained as varying by jurisdiction, the markup is a markup, and the path from $45.35 of overhead per man-hour to a $95 charge-out rate recomputes exactly. They are also candid that their company lost money when it priced by the square foot, which is the strongest argument for the method. The weakness is the number every other number depends on. Overhead is divided by 34,200 hours, which they describe as the most their crews could possibly sell, so the rate recovers overhead only if every one of those hours is billed. By our arithmetic, each billed hour contributes $61.40 towards roughly $1.55 million of overhead, which means labour breaks even at about 74% of the maximum; at full utilisation it earns around $549,000, close to their stated income, and at 80% only about $129,000. A beginner with thinner demand would under-recover overhead on every job while believing each bid was profitable. The fix is to divide by expected billed hours instead. Treat the results as unverified — "over $500,000 of income in 2023" was said in October of that year and not defined — and recompute the sample bid yourself from their inputs. The method is worth copying with that one change.

  • Charge-out rate — $95/hr
  • Overhead per man-hour — $45.35
  • Sellable hours — 34,200
  • Labour break-even — ~74% utilisation
  • Sample patio, recomputed — $12,630
  • Stated revenue — Past $4M
  • Stated 2023 income — Over $500k
  • Beginner suitability — Yes, with a buffer